// The right information, right before the work

Make sure the right people have read the right documents
before the work gets signed off.

Drawings change. Method statements get updated. Risk assessments get revised. The problem is never the paperwork - it's knowing whether the person on site actually saw it. Mark any document Required to View and it becomes a document that has to be read - before anyone can sign the work off, and again every time you upload a new version.

One tick
At upload, anywhere
Auto-notified
Only who's affected
Task locked
Until it's opened
Re-locks
On every revision
Upload it. Tick the box. DuoApp makes sure it gets read - and re-read every time it changes.
// How it works

Four steps, and none of them are yours.

01

Tick a box when you upload

Attach a drawing, spec, RAMS or safety notice anywhere in DuoApp - to a project, a block, a level, a plot or a single task - and mark it Required to View.

02

Everyone affected is told straight away

DuoApp works out who is assigned to the outstanding work underneath that document and notifies them automatically. No chasing, no group emails, no “did you get my WhatsApp?”.

03

They can't complete until they've opened it

Try to mark the work complete without opening the document and DuoApp stops you, showing exactly what's still to read. Once viewed, the task carries on as normal.

04

If the document changes, the clock resets

Upload a new version and everyone affected is notified again - and the task locks once more until they've viewed the latest. Nobody finishes a job against a superseded drawing.

// Admin sets · Worker confirms

One page to manage it.
One prompt to enforce it.

Admins decide what's mandatory and what it applies to. Workers get the right documents in front of them at the moment they try to finish the job - not buried in a folder they'll never open.

Document Alerts

/admin/document-alerts
Method Statement - Working at Height v3.1 · last updated 06 May
Roofing tasksScaffold erect
Required
Risk Assessment - Hot Works v2.0 · last updated 28 Apr
WeldingCuttingGrinding
Required
Site Safety Briefing - Plot 14 v1.4 · last updated 11 May
All tasks · Plot 14
Required
Work Instruction - First Fix Electrical v1.0 · last updated 02 May
1st fix electrical
Required

Completing a task

Roofing - Plot 14 · M. Okafor
Strip & re-felt - Plot 14 roof Locked

Before you can mark this task complete, please read and confirm you've understood:

Method Statement - Working at HeightRead 08:51 · v3.1 ✓ Acknowledged
Site Safety Briefing - Plot 14Read 08:53 · v1.4 ✓ Acknowledged
Risk Assessment - Hot WorksTap to open & confirm Pending
Mark complete · 1 document outstanding
// Why it matters

Proof, not hope.

No more “I never saw that revision.”

Every view is recorded against the person and the document, so you know exactly who has read what, and when.

The right information reaches the right people

DuoApp only notifies the people actually assigned to the affected work - so notifications stay meaningful instead of becoming noise everyone ignores.

Compliance you can evidence

When a client, auditor or insurer asks whether your operatives were briefed on the current revision, the answer is in the system - not in someone's inbox.

Superseded documents can't be worked to

The moment a document is replaced, the old version stops counting. Work can't be signed off against it.

// Where you can use it

Attach it at whatever level the document applies to.

Project

Site-wide inductions, site rules and master drawings.

Block or Level

Layouts and specifications for a particular part of the build.

Plot

Plot-specific drawings and variations.

Task

Method statements and instructions for one job.

The rule applies to every piece of outstanding work underneath whatever you attach it to - so a site induction can cover an entire project, while a method statement covers one job. Same tick box, different reach.
// Questions

How it works in practice.

What happens if someone tries to finish a task without reading the document?
DuoApp blocks the completion and shows them exactly which documents are still outstanding, with a tap to open each one. As soon as they have viewed it the task unlocks and they carry on as normal - there is no approval queue and nobody has to be chased.
Who gets notified when I mark a document Required to View?
Only the people assigned to outstanding work underneath that document. Attach it to a plot and it reaches everyone with open tasks on that plot; attach it to a single task and it is just the people on that task. Notifications stay meaningful because they never go to the whole site.
What happens when a drawing is revised?
Uploading a new version resets the requirement. Everyone affected is notified again and their tasks re-lock until they have opened the latest revision, so work cannot be signed off against a superseded document.
Can I prove who read what, and when?
Yes. Every view is recorded against the person, the document and the version, with a timestamp - and it forms part of the project's audit trail, so it is already there when a client, auditor or insurer asks.
What can I attach a Required to View document to?
A project, a block, a level, a plot or an individual task. The rule applies to all outstanding work underneath whatever you attach it to.

Know the revision was read - not just uploaded.

See it on your own drawings and RAMS. Bring a real document pack and a live plot, and we'll set the rules up with you in 30 minutes.